Contact us

Environment & Nature

We combine knowledge of nature, environmental impact assessment and the practical planning of the project. You’ll receive a clear roadmap from a single partner, covering everything from preliminary studies through to the EIA, planning permission, construction and monitoring.

We identify project risks at an early stage so that we can still influence the planning process

Agile approach
Multidisciplinary teams
Transparent work
Personalised service

Essential studies and surveys – Better decisions

Nature and biodiversity surveys

We will assess the natural values of the project area at the appropriate time and to the appropriate extent. We will carry out surveys of vegetation and habitat types, as well as surveys of bird, bat, flying squirrel, moor frog and other species, and assessments of ecological connectivity.

Some of the surveys we offer:

Flying squirrel survey

Moor frog survey​

Vegetation and habitat type survey​

Bat survey​

Bat survey​

Bat survey​

Large carnivore survey including wolf, lynx, bear etc.

Different bird surveys: nesting bird survey, owl survey, flight route survey of diurnal birds of prey, migration monitoring of birds and flocks of resting birds​ etc.

Game survey​ 

European beaver survey​

Snow tracks of mammals

Otter survey​ 

Butterfly survey​ 

Survey of dragonflies​

Underwater surveys and sediment sampling

Occurrence surveys of endangered or other species

Genetic analyses and eDNA work 

Drone photography

EIA procedures and Natura assessments

We guide the EIA process from the preliminary studies through to the assessment programme, the impact assessment and the assessment report. We coordinate the studies, planning, and cooperation with the authorities and stakeholder engagement into a single, well-managed whole. Additionally, we prepare Natura assessments and needs assessments. 

EIA programme 

EIA report

Public engagement

Natura 2000

Environmental permit

Water permit

Restoration and ecological compensation

We help put the mitigation hierarchy into practice. We plan restoration and compensation measures, calculate the number of hectares of natural value, and produce the documentation required for processing by the authorities.

Hectares of natural value 

Compensation

Monitoring

Water, stormwater and soil

We carry out surface water and groundwater studies, stormwater and water management plans, soil surveys, and assessments of the impacts during construction and operation.

Surface water

Groundwater

Stormwater

Landscape, climate and the circular economy

We complement the project portfolio with landscape and cultural environment assessments, emissions calculations, circular economy assessments and practical environmental consultancy services, from design through to construction.

Landscape

Climate

Circular economy

Environmental work is not a side issue
It is part of project management

01

Identify

We conduct a preliminary study which includes identifying risks related to nature, permits and planning before any major decisions are made.

02

 Target

We target and focus on only the studies and fieldwork that are essential for the project, meaning unnecessary studies are not carried out.

03

Combine

We make sure that EIA, planning, technical design, permits and stakeholder engagement all progress at the same pace.

04

Confirm

We confirm that recommendations are incorporated into plans, permits, construction, monitoring and practical measures.

When a project changes the environment,
we help to find a sustainable way to implement it

We understand the timelines, interdependencies and decision-making processes involved in projects relating to the green transition, the built environment and infrastructure. The environmental and nature specialists work closely alongside the project development and technical design teams.

Data centres

Wind and solar power

Electricity transmission

Industry

Infrastructure and transport networks

Local authorities and land use

The expertise of a large organisation
The personal touch of a small team

Welado’s strength lies in its ability to combine a comprehensive understanding of the project as a whole with agility, personal responsibility and solutions that are tailored to the design process.

Ask first
Make sure you get it right

As early as possible. Many species and habitat surveys are tied to a specific time of year. An early preliminary survey helps to ensure that the right fieldwork periods are booked and prevents the project from being delayed.

We assess the type, scale, location and likely impacts of the project. Where necessary, we prepare a well-founded EIA scoping report and provide support in discussions with the authorities.

Yes. Timelines, studies, alternatives and stakeholder engagement should be planned as a single integrated process. This reduces duplication of work and ensures that planning information is available at the right time.

The work may include an assessment of the adverse impact, a review of the mitigation hierarchy, the calculation of hectares of natural value, the planning of the compensation area and measures, as well as application and monitoring documentation.

What does your project need right now?

Tell us the project’s location, stage and objective. We’ll put together an overview of the necessary assessments, procedures and next steps.

Contact us

Your message concerns
name

More More Environment & Nature experiences experiences

  • NEWSROOM

    Stay up to date – here are the latest news, announcements and blog posts.

    Read more news

    Environment & Nature